Sólo mostramos lo que declara el aviso; puede tener más.
18 apartment building DESCRIPTION 4 levels ( PB - 1ER - 2D0 - 3ER floor) 11 garage spaces (9 covered and exterior) Construction started in September 2021 and finished in October 2022 Ground floor parking space, 3 automated vehicular access gates, 1 pedestrian gate, electric intercom The 18 apartments are rented and each floor is made up as follows First, Second and Third Floor - Front View 1 apartment (45.5 MTS2) with 2 bedrooms with closets, split, fan and curtain - Bathroom - furnished kitchen + stove + extractor + split + fan 1 apartment (46.9 MTS2) with 1 bedroom with closets + curtain + split + fan, bathroom, furnished kitchen + extractor + stove 1 apartment (45.4 MTS2) with 1 bedroom with closets + curtain + split + fan, bathroom, furnished kitchen + extractor fan + stove and laundry room First, second and third floor - Back view 3 studio apartments of 32 m2 each. Room with wardrobe / closet + toilet + curtain + fan + split, bathroom, furnished kitchen + stove + extractor + fan All departments also have an electric doorman, heating system, fire system, fire extinguishers, all embedded pipes (including split), connections for cable and internet service, alarm service facilities and closed circuit. Technical details porcelain floor plastered walls coatings in the bathrooms deca taps fixed panel in bathroom showers blindex ceiling lights and sconces washing machine facilities in each apartment
1ro de Mayo casi 11 de Setiembre - 1ro de Mayo casi 11 de Setiembre - Pitiantuta, Fernando De La Mora, Central, Paraguay
Irene Britez
Ver el aviso original